Offsites Area Lead 3: Lake Water Abstraction (LWA) job at Total Energies

Job Expired

Candidate Profile
Qualifications & Experience
• Engineering degree.
• Minimum 9 years oil & gas experience (Company graduate program engineer or relevant experience) with significant relevant multi-discipline engineering experience in EP industry is required to provide the necessary overview of the business, with experience in planning or project engineering.
• Strong technical, analytical, innovative and commercial skills. A good experience in planning, budgeting and managing interfaces. Thorough understanding of the risks and the technical/commercial issues associated with the development of oil and gas projects.
• Some experience of construction onshore and preferably offshore with a good understanding of the construction constraints and implications for the project development. Capacity to manage activities on a construction site is a must.
• Conversant with International, group engineering standards, as well as HSE standards. Ability to understand the specific risk induced by offshore installation activities.
• Good communication skills and an aptitude for taking initiatives are essential, as is the ability to work in multi-disciplinary teams. Ability to manage the relationship with key stakeholders.
• Proven track record of result deliveries in challenging project environments.

Activities
Main Duties and Responsibilities:
• Participate in technical meetings during the detailed design: to provide support and expertise and contribution to the progress of the detailed design and procurement engineering.
• Participate to construction meetings and guide the resolution of construction related issues linked to his/her area.
• Participate to the Project HAZOP/SPOT and PTR and other audits and technical reviews, including coordination of Project answers and final resolution.
• Ensure proper reporting for his/her area and to highlight critical issues to the Offsites & Drilling Interfaces Package Manager. Contribute to improving the project lessons learnt and personnel skills.
• Organize and participate in internal and with Contractor technical meetings, challenge the EPSCC Contractor, monitor and promote value engineering to contribute to cost saving. Promote alternatives design to optimize works and schedule.
• Identify and evaluate changes to basis for design, as early as possible, anticipate problems in his/her area.
• Promote local content initiatives together with the National Content team and Offsites & Drilling Interfaces Package Manager.
• Work closely, as required, with the Facilities Engineering Manager and lead DCC to ensure that the engineering deliverables, in particular the Class 1 from the EPSCC Contractor are reviewed and commented within the contractual timeframe.
• Work closely with the disciplines lead to ensure adequate follow-up of procurement and later coordination of equipment and material integration in the facilities.
• Organize the monitoring of the inspection plans for the equipment and material supplied for his/her area and ensure follow-up until such equipment and material can be released and incorporated to the Plant on site.
• Make sure with the Contractor that all necessary certifications for the installations means to be used for the installation of the line pipe, cable and platform on the lake are issued in due time.
• Organize installation procedures detailed risk assessment sessions with the contractor and ensure later that mitigation measures are in place and followed. Obtain support from the relevant head quarter disciplines to validate such procedure.
• Work closely with the construction team to coordinate his/her area’s activities during construction and ensure transverse management of site activities with the support of the relevant construction teams while offshore activities will take place.
• Lead the preparation activities for the construction of the LWA platform and pipeline installation: Ensure the good preparation of construction activities by Contractor: Method statement, readiness check list, engineering, JHEA, personnel mobilization, material mobilization. Identification and Set up of required support from TTE HQ for the review and approval of the construction documentation.
• Follow Contractor construction execution on site and anticipate/identify major key topics to be addressed. Manage and support CPY LWA construction team on site. Put in place weekly reporting for the LWA construction and HSE performance reporting. In cooperation with planning team, develop dashboard to monitor construction performance and progress. Organize ad-hoc planning and progress review with Contractor.
• Manage the planning of the well pad with the support of the planning team –implement it on a day-to-day basis during construction.
• Review and prepare input to variation orders.
• Anticipate potential claim from the contractor and alert the Offsites & Drilling Interfaces Package Manager. Propose approaches and elements of negotiation.
• Participate in the budget preparation and provide input to the project LOP for the part related to his/her area.

Job application procedure

Interested and qualified? Click here to apply

All Jobs

Subscribe to receive latest updates of jobs

More Information

  • This job has expired!
Share this job

Total Energies

1 2 3 4 5 (0)

Winstar Jobs

welcome to the trailblazer of opportunities. Don't miss out on daily job updates

Contact Us

21st Street, Old portbell Road, Kampala, Uganda
admin@winstarjobs.com
https://winstarjobs.com/contact-us-2


Contact us: +256771839076

Email: admin@winstarjobs.com

July
January
February
March
April
May
June
July
August
September
October
November
December
2025
1950
1951
1952
1953
1954
1955
1956
1957
1958
1959
1960
1961
1962
1963
1964
1965
1966
1967
1968
1969
1970
1971
1972
1973
1974
1975
1976
1977
1978
1979
1980
1981
1982
1983
1984
1985
1986
1987
1988
1989
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
2032
2033
2034
2035
2036
2037
2038
2039
2040
2041
2042
2043
2044
2045
2046
2047
2048
2049
2050
SunMonTueWedThuFriSat
29
30
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
1
2
00:00
00:15
00:30
00:45
01:00
01:15
01:30
01:45
02:00
02:15
02:30
02:45
03:00
03:15
03:30
03:45
04:00
04:15
04:30
04:45
05:00
05:15
05:30
05:45
06:00
06:15
06:30
06:45
07:00
07:15
07:30
07:45
08:00
08:15
08:30
08:45
09:00
09:15
09:30
09:45
10:00
10:15
10:30
10:45
11:00
11:15
11:30
11:45
12:00
12:15
12:30
12:45
13:00
13:15
13:30
13:45
14:00
14:15
14:30
14:45
15:00
15:15
15:30
15:45
16:00
16:15
16:30
16:45
17:00
17:15
17:30
17:45
18:00
18:15
18:30
18:45
19:00
19:15
19:30
19:45
20:00
20:15
20:30
20:45
21:00
21:15
21:30
21:45
22:00
22:15
22:30
22:45
23:00
23:15
23:30
23:45